我目前有NBN现场,它们在建筑物外部没有PCD直接进入NTD。
他们正在建议这是做到在建筑物外部不再有PCD的新方法吗?最近完成了,所以我想说的是
o.p.
mondy写信...
,没有试图找到我最近完成的许多高架安装的文档,所以我需要对我说是YEAS
网站!
我们升级的5个单元中只有3个也有PCD。 Seems like PCD's arent used as much anymore.
评论
The M writes...
running overhead fiber straight into the NTD inside with no PCD on the outside of the building.
there is one big disadvantage of this way of installation,
if the cable is ever gets damaged, the tech who will attend will not be super excited to replace it all the way to NTD, and may refuse to do it.
评论
I guess it pretty much a non issue, the pcd box is just where they join the two cable together so as long as the whole cable is not direct buried it's a piece of cake to rerun new cables and make new pcd in between
评论
lgacb08写入...
这是重新运行新电缆的一小菜,在
之间制作新的PCD
问题是,问题是需要在NTD机箱中剪接铅蛋白电缆,但大多数NBN Techs却没有融合splicer。 PCD盒几乎是一个问题,就是它们将两根电缆连接在一起的地方
是否也可以将较厚,更坚固,更昂贵的外部铅纤维电缆转换为更薄,更灵活(但更易碎)内部电缆的地方?我相信确保杆/坑到PCD电缆是一次一次性安装(NBN的责任)是这样的情况nbn
https://www.nbnco.com.au/
m写的是...
我目前有NBN现场,它们在建筑物外部没有pcd
也许,也许,如果内部的纤维在越过的屋顶上,则在屋顶上,它们是在屋顶上,就像在屋顶上驶过,因为屋顶上的屋顶是在屋顶上,
也许是在屋顶上,就像是在屋顶上,这是因为它是在屋顶上,而屋顶的范围是在屋顶上,并且是在屋顶上,并且是在屋顶上,而且是在屋顶上,而且是在屋顶上,而且是在屋顶上,而且是因为它的范围是在屋顶上( 力量)。 Heck this could be what they do with underground installs except this is done via the PCD as it is at ground level and needs to be protected.
评论
O.P.
PeteP writes...
Isn't it also where the thicker, more sturdy and more expensive external lead-in fibre cable is transformed to a thinner, more flexible (but more fragile) internal电缆
这是我的理解。我们的安装人员的长度线圈长度固定,在不可访问区域的天花板上有一大堆用于重新穿线等。
我们也被告知,我们也被告知,因为它的开销安装在前提内部的位置距离增加了12m,从12m增加到15m,从任何地方都没有在任何地方都看到了所有的工作。 2.5小时。
不幸的是无法安装机架,但没有大问题。