在澳大利亚房产房屋




买的房子如果在做Final inspection 时候发现小问题不少,比如地板不齐,窗不密封,可以以这个为理由拒绝settlement吗?

评论
看你签的什么合同,有没有subject to. 没有的话必须交割

评论
跟律师商讨

评论
一般合同裡面都有條款約定必須先settle然後再解決問題。
這些合同都是industry standard的,所以這些小問題一般是不能不收房的

评论

剛建好的新房吗?
有朋友找 Metricon 建房,之后找 independent inspector, 朋友是等 Metricon 改好一些 report 里的大 defects 后才付尾款!
我觉得地板不齐是大问题, 一定要改后才付尾款!
尾款沒付清,Metricon 也不可能把新房 hand over!
最后好像遲了兩星期才 hand over。

评论

这些问题一般不能,一般合同上说的都是除非面积差异超过%多少你可以退出合同,其它的都只能用3个月的保修来处理,我说的是公寓,自建房就不懂了

评论

It depends on the contract you have signed.
我簽的是 HIA standard contract, contract 里是要求 builder 改完 known defects 后才 pay final claim (final payment).
一旦付了 final payment, 要求 builder 改就烦( builder 通常拖)。

以下就是部份  HIA standard contract 的內容。
Completion and Handover:

Under clause 36, when the builder considers the Works
have reached “Completion” he must give the owner a
Notice of Completion and the Final claim.
The builder and owner must then meet on-site within 7
days of the owner receiving the Notice of Completion and
Final Claim, to hold an inspection (clause 36.2).
A written list of known defects and incomplete items is to
be generated at the inspection (clause 37) and the builder
must carry out work to rectify defects or complete items in
order to reach “Completion” – and serve a written notice
when this has been done. The owner must then pay the
Final Claim within a further period of 7 days.
Note that the builder must not demand final payment (the
Final Claim) until the builder has given to the owner a
copy of the Occupancy Permit (or the certificate of final
inspection).


评论
绝对不可以

评论
学习了

评论
看合同

评论

好像没写。。。。我大意了

评论
no

评论
二手房一般都是sale as is,除非有證據證明你看到的瑕疵是從簽合同到settle那段時間造成的損壞,否則沒辦法延遲settle,也不太可能要求補償的

评论

是新建的那种

评论

那么,如果必须交割,交割之后 Builder 拖着不修,有什么法律手段让他们履行义务么?

评论

哦原來是新建的,那就要看合同了,據理力爭吧,這樣的房子住進去也會不爽的。

和自己的律師商量一下怎麼樣做最好

评论
標題就寫的新房啊

评论
请问defect check到最终settle大概多久?

评论

普遍的 contract 应和 HIA contract 差下多。
Just tell your builder you will only pay the final payment only if they fix the defects(or at least the floor's tiles) in the report.
There is no way you can put your furniture in the house if the floor's tiles are not fixed

评论

Make sure you have a proof that you have sent the defect list to your builder before the 3 months warranty. 如果 builder拖了很久也不修,你可以上court要他们赔錢。

评论

问题这个法律条款支持吗?我的律师不知道是敷衍我还是什么,说这个除了结构变化,否则没有办法不settle。。

评论

我的 contract 上写明 fix 完 known defects 才 pay final payment。
如果我和 builder 都 sign 了contract ,任何一方不 follow 就是 breach the contract, 可以经法律追究损失的。

如果你在 Melbourne, 你可以电 Victoria consumer affairs

https://www.consumer.vic.gov.au/ ... g-for-building-work

Making final payment
The building project is complete, and you make the final payment, when the work is finished in accordance with plans and specifications and the Occupancy Permit has been issued (for a new home) or a Certificate of Final Inspection has been issued (for an extension or renovation). The builder is not entitled to the final payment until then.

You can pay an independent building consultant to check for defects or unfinished work, and to advise you of any issues which have affected completion of the project. If you have concerns:

make a list of any work that you believe is faulty or incomplete
speak with your builder immediately about your concerns
put your request and any agreements made with the builder to finish work in writing, and send it by registered post.
If you are in dispute about areas of work, contact our Building Information Line on 1300 55 75 59 between 9:00 am to 5:00 pm, Monday to Friday (except public holidays). Calling this number costs the same as a local call. Additional charges may apply if you are calling from overseas, on a mobile or payphone.

评论

其實我 builder  在未出 OP 之前已 push 我 pay final payment。Builder 还扬言如不pay immediately, 他们要收 interest。
於是我 contact Consumer affairs victoria, 后來我被 transfer to another department,
他们告诉我 by laws 我是不需要 pay a cent (before the OP is issued and all works is complete)。他们还教我如果 builder 不 finish fixing defects, 我可以hold 起部份 final payment(自己 estimate 那些 defects 的 fixing fee)



评论
起码可以先拒绝,看他们的态度如何,一般建筑商都会搞定的。我以前建房建筑商的态度我还是很满意的。一些小问题在settle后也都第一时间解决了,而且不止一处,查出来立即电话,那边就过来修

评论

你是那间建筑商?

评论
记得合同里好像有一条说,如果修理费用超过总成交额的一定比例的话,卖方可以要求取消成交的。

利用这一条,可以要求卖方修理完毕再成交。

有的时候,卖方会嫌修理费用太高,而决定取消成交的。

评论

Burbank

评论

如果地是自己买入, builder 只负责建房,怎么取消成交?
澳洲中文论坛热点
新西兰总理:出世在新西兰的新纳粹Thomas Sewell是“挺蹩脚的人”,但那是澳洲的问题
新西兰总理拉克森称新纳粹Thomas Sewell是坏人,但是没对要求把他从澳大利亚遣返到诞生国去的呼吁置评。
撞穿学校栅栏害死十一岁男孩的司机不必坐牢
一位女司机撞穿学校栅栏、害死了11岁男孩,被罚2000元罚金、撤消驾照,不必坐牢。Jack Davey 的父母去了

过户律师,悉尼,买房卖房合同,看合同,conveyancer,律师,房产过户

房产房屋

所有权贷款利率

澳大利亚如果大约有60万元人民币,那么利率可以好于5.63%吗? 评论 是自助服务还是投资 评论 您自己 评论 5.49% 评论 我的经纪人让我5.1% 评论 它是哪个银行?评论?它是哪个银行?谢谢你? ...

房产房屋

房地产在紧急市场上代表什么

澳大利亚我刚刚收到了该机构的短信,要求我们立即去看房子。为什么会发生这种情况?看起来不错 评论 这首先是市场来测试市场。不要那么兴奋,要冷静。评论 评论 首先要找到吸盘。如果您 ...

房产房屋

浴室柜的更换

澳大利亚亲爱的亲爱的亲爱的,家里的浴室柜由于漏水而被浸泡,必须更换。尺寸为1700mm,我认为这不是标准或常见的。 在这种情况下,我想我必须找到一个橱柜工厂来测量尺寸并自定义,对吗 ...

房产房屋

帮助拆除墙壁和变化的结构

澳大利亚房子在二楼。想要拆除一楼的两间卧室之间的墙壁,有几扇门想改变方向。 您能找到一名结构工程师来绘制图纸,然后找到木匠来修改结构?不申请建筑许可? 另外,如果可能的话,墨 ...

房产房屋

厨房下水道管被阻塞并寻求帮助

澳大利亚家里的旧房子堵塞了厨房的下水道。可以去除的所有东西都被删除了,房屋地下的老式陶器仍被封锁。然后房子翻新了。之前在厨房外建造了一个阳光房,维护入口的位置被新的楼层覆 ...

房产房屋

问题租户拒绝检查和租金(QLD)

澳大利亚O.P. 大家好, 目前,我目前为我的乡亲在布里斯班管理两个物业。我遇到了两个单独的问题,并会喜欢想法或类似的经历。 1。目前的租户拒绝访问和租金: 该租金中的租户目前拒绝支 ...

房产房屋

排水地役权到底是什么?

澳大利亚我在网上发现排水地役权通常用于对雨水进行排名。购买房屋时,该机构还表示,雨水​​可以在这里排名。但是现在建筑商说: ‘关于雨水设计,我已经与我们的施工前经理讨论了这 ...

房产房屋

紧急租金寻求帮助!呢

澳大利亚因为我只是来澳大利亚租房,对这种情况不了解,所以我想请所有的朋友和大wigs以提出他们的意见。 (我想在这里表示感谢!) 当我搬进来时,屋顶泄漏了,模具很差。将电子邮件发 ...

房产房屋

询问有关高架电缆的问题

澳大利亚如果我的邻居建造树枝并切断我的高架电缆,该怎么办? 我在线阅读。我应该如何将其报告为私人高架电线? 评论 单击电工来捡起它 评论 如果剪下电线,您的房屋将被关闭。这部分不 ...

房产房屋

撤离的通知:是统计数据必要的

澳大利亚O.P. 我们拥有当前正在定期租赁的租赁财产。我们最近出售了我们的主要居住地,并计划自己进入租赁物业。 我联系了物业经理,向租户提供了所需的三个月通知。但是,代理要求法定 ...

房产房屋

没有净成本太阳能

澳大利亚最近,有人来建议安装无净成本。安装它的任何朋友可以共享它吗?是陷阱吗? 评论 您认为会有这样的好事吗?如果您购买的东西会有很多卖东西吗? 进一步,您计算回报率 评论 是的 ...

房产房屋

圣地这么疯狂吗?

澳大利亚http://www.realestate.com.au/pr ... d-st-ives-nsw-2075/ 遗产房屋具有良好的外观设计,但是在居民区中期的感觉被装饰绘制的大白色墙壁摧毁了。背后有一个不适当的主人……整个房子和庭院都无法 ...

房产房屋

身体公司调解申请

澳大利亚O.P. 另一个所有者和我本人正在尝试在某些阻塞的问题中解决最后一个问题。 基本上,两个所有者认为,从洗手盆到淋浴的浴室地板下运行的排水管中存在生锈问题,这是一个身体公司 ...